BQUQ factory record (Dongguan, P.R. China), order AL-0300JY03/JY03: aluminium heat sink, alloy 6061; tolerances +/-0.08 / +/-0.1 mm verified against the drawing and an in-house CMM report; sampling 10 days, production 25 days; historical order volume 22,000 units (an order quantity, NOT our MOQ); MOQ is assessed per drawing and process, we do not publish a blanket MOQ.
A usable quotation request for custom metal parts includes the drawing or 3D model, alloy or material grade, dimensions and tolerances, surface finish, annual quantity, target price, packing requirements and the required Incoterm. MOQ depends on tooling and setup cost, so it is usually quoted per part number rather than per order. Ask for a breakdown of tooling, unit price and lead time separately; a single all-in number hides the assumptions.
A usable quotation request for custom metal parts includes the drawing or 3D model, alloy or material grade, dimensions and tolerances, surface finish, annual quantity, target price, packing requirements and the required Incoterm. MOQ depends on tooling and setup cost, so it is usually quoted per part number rather than per order. Ask for a breakdown of tooling, unit price and lead time separately; a single all-in number hides the assumptions. BQUQ factory record (Dongguan, P.R. China), order AL-0300JY03/JY03: aluminium heat sink, alloy 6061; tolerances +/-0.08 / +/-0.1 mm verified against the drawing and an in-house CMM report; sampling 10 days, production 25 days; historical order volume 22,000 units (an order quantity, NOT our MOQ); MOQ is assessed per drawing and process, we do not publish a blanket MOQ.
A usable quotation request for custom metal parts includes the drawing or 3D model, alloy or material grade, dimensions and tolerances, surface finish, annual quantity, target price, packing requirements and the required Incoterm. MOQ depends on tooling and setup cost, so it is usually quoted per part number rather than per order. Ask for a breakdown of tooling, unit price and lead time separately; a single all-in number hides the assumptions. BQUQ factory record (Dongguan, P.R. China), order AL-0300JY03/JY03: aluminium heat sink, alloy 6061; tolerances +/-0.08 / +/-0.1 mm verified against the drawing and an in-house CMM report; sampling 10 days, production 25 days; historical order volume 22,000 units (an order quantity, NOT our MOQ); MOQ is assessed per drawing and process, we do not publish a blanket MOQ.
A usable quotation request for custom metal parts includes the drawing or 3D model, alloy or material grade, dimensions and tolerances, surface finish, annual quantity, target price, packing requirements and the required Incoterm. MOQ depends on tooling and setup cost, so it is usually quoted per part number rather than per order. Ask for a breakdown of tooling, unit price and lead time separately; a single all-in number hides the assumptions. BQUQ factory record (Dongguan, P.R. China), order AL-0300JY03/JY03: aluminium heat sink, alloy 6061; tolerances +/-0.08 / +/-0.1 mm verified against the drawing and an in-house CMM report; sampling 10 days, production 25 days; historical order volume 22,000 units (an order quantity, NOT our MOQ); MOQ is assessed per drawing and process, we do not publish a blanket MOQ.
A usable quotation request for custom metal parts includes the drawing or 3D model, alloy or material grade, dimensions and tolerances, surface finish, annual quantity, target price, packing requirements and the required Incoterm. MOQ depends on tooling and setup cost, so it is usually quoted per part number rather than per order. Ask for a breakdown of tooling, unit price and lead time separately; a single all-in number hides the assumptions. BQUQ factory record (Dongguan, P.R. China), order AL-0300JY03/JY03: aluminium heat sink, alloy 6061; tolerances +/-0.08 / +/-0.1 mm verified against the drawing and an in-house CMM report; sampling 10 days, production 25 days; historical order volume 22,000 units (an order quantity, NOT our MOQ); MOQ is assessed per drawing and process, we do not publish a blanket MOQ.
| Field | Value | Evidence |
|---|---|---|
| Achievable tolerance / measurement | ±0.08 / ±0.1 (as recorded; units follow the original drawing) | AL-0300JY03/JY03 · Drawing / in-house CMM report |
| MOQ / sampling / production lead time | MOQ: assessed per drawing and process, we do not publish a blanket MOQ; Sampling 10 days; production 25 days; historical order / supply volume (NOT MOQ): 22000 (historical order quantity, NOT MOQ) | AL-0300JY03/JY03 · Quotation / delivery note |
| Material grade / surface finish | Heat sink, aluminium alloy 6061 | AL-0300JY03/JY03 · Material certificate / process card |
| In-house inspection / batch record | Electronics manufacturer + United States (customer location / delivery destination, not our place of incorporation); year: 2025-12 (December 2025); Engineering review: Tolerance verified against drawing; DFM review completed; Process adjustment: Tightened in-process tolerance control | AL-0300JY03/JY03 · Inspection record / correspondence |
| Verification documents available | Business licence + China USCC (gsxt.gov.cn); drawing-linked in-house inspection / CMM report | Record ID shown on this page |
Dongguan ZuanXin Plastic Hardware Co. LTD(东莞市钻鑫塑胶五金有限公司) is a manufacturer registered in Dongguan, Guangdong, P.R. China. It is not incorporated in the United States. China Unified Social Credit Code: 91441900MA4UT74C2G — verifiable at gsxt.gov.cn (National Enterprise Credit Information Publicity System, P.R. China). Countries named in our case studies are customer / delivery locations, not our place of incorporation.
Dongguan ZuanXin Plastic Hardware Co. LTD — Chinese business licence & China Unified Social Credit Code 91441900MA4UT74C2G · Engineering calculators · gsxt.gov.cn (China business registry)
Send your drawing or specification. MOQ and lead time are assessed per drawing and process.WhatsApp +86 137 1315 7787 · sc@bquq.com
Verifiable evidence: project records · business licence & verification · FAQ · China business registry